Solar-thermal cylinders

Published:  03 December, 2012

MHS Boilers, solar thermal, renewable energy, domestic hot water, DHW

MHS Boilers offers two ranges of solar-hot-water cylinders with capacities from 215 to 3000 l. Made from Duplex stainless steel for corrosion resistance, these unvented cylinders are fully compatible with the company’s solar-thermal flat-plate and vacuum-tube collectors.

There are three cylinders in the Inox-Solar Twin range with capacities from 215 to 305 l. They are tested to 15 bar and do not require an anode. An immersion heater is pre-fitted. These cylinders have a 25-year warranty, with all other components guaranteed for two years.

Inox-Maxi commercial cylinders (pictured) and hot-water buffer storage vessels have capacities from 45 0 to 3000 l. They have solar-coil surface areas of up to 10 m2 and can accommodate solar-collector fields of up to 50 m2. These cylinders do not require sacrificial anodes and do not have powered active protection systems. The body has a conditional 5-year warranty; all other components are guaranteed for a year.

MHS can also produce bespoke cylinders tailored to a project’s specific requirements.

For more information on this story, click here: Dec 2012, 181

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
July 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Show

Jobs

  • Property Surveyor

    Property Surveyor/ Building Service Surveyor needed to work within the Technical Services team for the management of water hygiene/ legionella risk within DCC's property portfolio. We are looking for an experienced and dynamic team member to join our T......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar