Ability adds latest Matrix software to more FCUs

Published:  03 December, 2012

Ability Projects, fan coil unit, FCU, air conditioning

Ability Projects has applied the third generation of its Matrix controls strategy to its Trojan 270, Atlas 235 and Slimline fan-coil units as a further step to incorporating Matrix into its entire product range. The main benefit of Matrix is its ability to remotely monitor and adjust any aspect of the fan coil — including water flow rates. The Matrix system continues to feature ‘self-setting’ air volumes and now also includes self-setting and self-correcting water flow rates.

Controlling the air side of an fan-coil unit is relatively easy, it generally being small and self contained.

However, the hydraulic side is much more complex, since each Matrix PICC (pressure-independent control valve) is part of the building’s entire hydronic system.

Variations in water flow caused by, say, a bypass elsewhere in the system being left open, can be addressed by the Matrix system. Its self-correcting capability includes a software routine that monitors the performance of the FCU and temporarily adjusts the water flow upwards or downwards as required. This feature can also compensate for the varying water-supply temperatures that occur in a large system.

Established benefits of Matrix include making it easier to respond to fit-out changes, revisions in design parameters and assisting ‘soft-landing’ commissioning carried out over a period of time rather than on a fixed date. The key to such capabilities is the remote setting of PICC valves compared with manual setting.

For more information on this story, click here: Dec 2012, 166

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
February 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Intermediate / Senior Mechanical Engineer

    The Mechanical team undertake the design and specification of a range of Mechanical building services in a lead or supporting role, depending on project complexity and scale. You should demonstrate a flexible approach to design and team working and wil......

  • Senior Urban Designer

     Applicants will be Master’s Degree qualified Architects / Urban Designers, with a strong portfolio of work highlighting a variety of projects at a range of scales and types, with strong focus on regeneration, infrastructure-led projects and major develo......

  • Principal Structural Engineer

    We are currently recruiting on behalf of a global client, with a diverse range of award winning projects to their name. Their experience spans a host of market sectors, including transport, infrastructure, defence, scientific, education, high-tech and ......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"