Lancaster Town Hall updates with equipment from Baxi Commercial

Published:  01 November, 2013

Baxi Commercial, Andrews Water Heaters, space heating, boiler, DHW
The historic Lancaster Town Hall is now served by modern heating and hot-water systems with equipment from Potterton Commercial and Andrews Water Heaters.

Baxi Commercial has supplied three Potterton Commercial floor-standing condensing boiler and an Andrews Water Heaters’ gas-fired storage water heater as part of a thorough upgrade of an obsolete system at Lancaster Town Hall. This imposing Edwardian building was opened in 1909 and is now mainly a prestigious venue for meetings, exhibitions, banquets and the celebration of marriages and civil partnerships.

With such a wide range of functions, a flexible and efficient system was required.

The previous system comprised nine modular atmospheric boilers, a dedicated boiler for domestic hot water and two large calorifiers. There were obsolete parts on the boilers, resulting in only three functional units. The calorifiers stored too much water for the potential use and were connected to a poorly functioning circulation system.

The circulation system was rectified and the volume of stored water reduced by using the rapid heating capability of the storage water heater. It has a capacity of 300 l and can deliver up to 510 l/h. Water is stored at 60°C and delivered at 56°C to each thermostatic mixer valve with an outlet temperature of 41°C. Hot water is generated in condensing mode for up to 80% of the tank’s capacity.

The space-heating boilers were selected for having waterways that were not overly small to reduce the risks associated with installation in an existing system. The heating system has been converted from open-vented to pressurised with an expansion vessel. A sealed flue replaces the previous flue, which terminates up through the chimney stack. The boilers serve existing radiators, with new control valves, and air-conditioning units.

All the equipment is connected to the site’s BMS, which provides weather compensation, zone control and logging of gas usage via dedicated gas meters.

The new equipment was installed in the basement plant room by Pinington Construction.

For more information on this story, click here: Nov 2013, 120

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
September 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Show

Jobs

  • Field Sales Executive

    Successful professional technical salesperson required to sell to consultants and contractors. Unique opportunity to sell ultra-low energy, patented technology, ventilation products from a UK manufacturer. ...

  • Property Surveyor

    Property Surveyor/ Building Service Surveyor needed to work within the Technical Services team for the management of water hygiene/ legionella risk within DCC's property portfolio. We are looking for an experienced and dynamic team member to join our T......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar