Combi boiler has integral hot-water storage

Published:  19 August, 2006

boiler
Combining the benefits of a combi boiler with water storage — Glow-worm’s Xtramax HE condensing storage combi boiler.

Glow-worm has introduced a condensing version of its popular Xtramax boilers. The Xtramax HE High Performance storage combi is rated at 33 kW and stores 200 litres of hot water for instant delivery.

These boilers have a SEDBUK rating.

Hot water can be drawn from two or three taps at the same time — at much higher flow rates than from a normal combi boiler. When the stored water has been depleted, hot water continues to be delivered at 14 l/m at a 35 K temperature rise. Recovery time is four minutes.

Standard features include a built-in bypass, integral filling loop, 2-stage frost protection and anti-seizure controls. Flues can be up to 5 m horizontal, 5.5 m vertical and 40 m twin.

The boilers also achieve NOx Class 5 emissions.



comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
August 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Show

Jobs

  • Field Sales Executive

    Successful professional technical salesperson required to sell to consultants and contractors. Unique opportunity to sell ultra-low energy, patented technology, ventilation products from a UK manufacturer. ...

  • Property Surveyor

    Property Surveyor/ Building Service Surveyor needed to work within the Technical Services team for the management of water hygiene/ legionella risk within DCC's property portfolio. We are looking for an experienced and dynamic team member to join our T......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar