VRF air conditioning provides heating and cooling for major office refurbishment

Published:  08 April, 2007

VRF
A new lease of life has been given to this 1980s office building in Newbury with the installation of four Toshiba VRF systems to provide both heating and cooling.

Heating costs have been cut and the benefits of air conditioning brought to a large 1300 m2 office building in Newbury by the installation of four large Toshiba VRF systems.

The refurbished space in Leat House was not preciously air conditioned, having been designed in the late 1980s with a perimeter wet heating system. It was removed by contractor Air Concepts, and a comprehensive environmental control system was designed to cope with the high solar gain in this extensively glazed building.

The design uses Toshiba Super Heat Recovery Modules to make up four large air-conditioning systems with a total capacity of 125 kW and able to supply both heating and cooling. The building is zoned for letting to four potential tenants, with separate control systems enabling each tenant to manage their own energy budget and environment.

A heat-recovery ventilation system has also been installed by Air Concepts. It uses the ceiling space as a return-air plenum.



comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
July 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Energy and sustainability: Performance and analysis manager

     An exciting opportunity will arise shortly for an exceptional person with extensive experience of managing sustainability within large complex organisations. Can you demonstrate extensive experience of energy management, proven ability to drive program......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar