Work goes on while Fujitsu VRF system is installed

Published:  02 September, 2004

Fujitsu
From design to running in just four weeks, the outdoor units serving a Fujitsu VRF air-conditioning at a health centre in Huddersfield.

Not only was only four weeks available for the design, installation and commissioning of an air-conditioning system for a community health centre in Huddersfield, but it also had to remain operational throughout.

Faced with these challenges, Air Conditioning Distribution recommended Fujitsu’s VRF system for the Mill Hill Community Health Centre of Huddersfield Central NHS Trust.

The company’s Darrell Lennox explained, ‘Midland Jay Heating & Air Conditioning supplied a performance specification requiring ACD to provide the system design and recommended manufacturer. We selected Fujitsu because of the wide range of indoor units available with their VRF system.’

Three 2-pipe AOY90 condensers, each with a nominal cooling capacity of 28 kW and heating capacity of 31 kW, were connected to 26 indoor units that included wall-mounted and ceiling cassettes.

Fujitsu’s VRF system can comprise up to 100 refrigeration circuits with up to 400 indoor units on one transmission network using a centralised controller or PC. Systems can operate individually, with indoor units run independently from one another or controlled on groups by a master controller.



comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
July 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Energy and sustainability: Performance and analysis manager

     An exciting opportunity will arise shortly for an exceptional person with extensive experience of managing sustainability within large complex organisations. Can you demonstrate extensive experience of energy management, proven ability to drive program......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar