Modern Building Services
News | Features | Subscribe | Jobs | Contact us | Advertise with us | Events diary |
Distribution boards incorporate L2 energy metering facilities
Published:  November 2007
boards

To help specifiers and installers meet the requirements of Part L2 of the Building Regulations for non-domestic premises, Eaton has introduced a range of energy-metering solutions. They simplify the provision of metering for lighting, small power and other loads at the final distribution board and reduce the need to wait for factory-made specials.

The Building Regulations require, in effect, separate energy metering at all final distribution boards above 50 kW in non-domestic premises with a floor area greater than 500 m2

Eaton offers two approaches.

• Type A distribution boards with integral metering.
• Separate meter packs that can be installed with Type A single-phase and Type B 3-phase Memshield 2 distribution boards.

Both options are available with a split-metering option to enable small-power and lighting loads to be metered separately. Mike Lawrence, product manager for commercial assemblies, says, ‘There is a huge market for MCB distribution board, but in future many of these will need metering of the incoming supply. Eaton’s new Memshield 2 meter packs and Type A boards with integral metering offer contractors a cost-effective way to meet these requirements without having to resort to special factory-built solutions.’


For more information on this story, click here:Nov 07, 170



  • Show
E-mail Updates
Poll

We're hearing occasional reports that the Building Services industry is starting to pick up again. Does this match your experience?

  • Yes, we're seeing a noticable upturn.
  • Yes, we're seeing a slight upturn
  • I have not suffered any decline in business in the last 12 months
  • No, no change
  • No, things are getting worse
Calendar

Webmaster
Privacy Policy

© Modern Building Services - Portico Publishing Ltd - 2004 - 2012

Web Counter by TrafficFile.com