Ground-source energy serves school buildings in Sheffield
Published:  02 April, 2008
Ground source, Heat pump, Eco heat pumps

60% of the energy needed for heating, cooling and domestic hot water for new buildings at a school in Sheffield is provided by a ground-source heat-pump installation. Sharrow School is little more than a mile from the city centre.

21 boreholes drilled into the coal measures and mudstone beneath a grassy knoll serve a system designed by Eco Heat Pumps which can provide 220 kW of heat. Before installation began, Eco Heat Pumps carried out a week-long thermal-conductivity test programme using a special rig, complete with mobile LPG boiler plant and computer equipment to monitor the energy drawn from a trial borehole.

A water-glycol mixture is pumped through pipework in the boreholes to extract energy from the ground, which is at a temperature of 4 to 9C according to the season. The temperature of this heat is upgraded by the heat pumps.

An ample supply of hot water is held at 60C in two 1000 l storage tanks.

Cooling is provided by passing water at 14 to 15C from the 1800 l buffer tank through plastic pipes embedded in the floor. If this approach to cooling is insufficient, it can be supported by the heat pumps. It is expected that passive cooling will be adequate for virtually all occasions. Integral dew-point protection is provided via a controller linked to the BMS.

Five Thermia Robust heat pumps serve the 2888 m2 of buildings. COP for DHW is 2.8, with a seasonal COP for heating of up to 4.1. The cooling requirement is provided using very little energy a COP of around 100).




Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
February 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Jobs

  • Intermediate / Senior Mechanical Engineer

    The Mechanical team undertake the design and specification of a range of Mechanical building services in a lead or supporting role, depending on project complexity and scale. You should demonstrate a flexible approach to design and team working and wil......

  • Senior Urban Designer

     Applicants will be Master’s Degree qualified Architects / Urban Designers, with a strong portfolio of work highlighting a variety of projects at a range of scales and types, with strong focus on regeneration, infrastructure-led projects and major develo......

  • Principal Structural Engineer

    We are currently recruiting on behalf of a global client, with a diverse range of award winning projects to their name. Their experience spans a host of market sectors, including transport, infrastructure, defence, scientific, education, high-tech and ......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"