Daikin doubles shifts at Ostend factory

Published:  10 November, 2009

In response to recent positive signs in the European heating and air-conditioning market, Daikin Europe has taken on 200 temporary staff to boost production at its main factory in Ostend, Belgium. Most of the production lines are switching from a single day shift to a 2-shift operating system.

Sales during the summer for Daikin Europe gave positive signals, following the launch of the Altherma HT air-to-water heat-pump system and the acquisition of a number of key VRV projects.



comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
August 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

BESA conference 2018

Jobs

  • Building Energy Management Systems (BEMS) Engineer

      Consistently rated amongst the world's best universities, Imperial College London is a science-based institution with a reputation for excellence in teaching and research. Imperial has one of the largest and most diverse university estate portfolios in......

  • Engineering Technical Assistant

      Consistently rated amongst the world's best universities, Imperial College London is a science-based institution with a reputation for excellence in teaching and research. Imperial has one of the largest and most diverse university estate portfolios in......

  • Mechanical Engineer

      Coventry University is a dynamic, modern university with a proud tradition as a provider of high quality education and a focus on applied research. The University ranked 13th in the Guardian University Guide 2019 and was voted ‘Modern University of the......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar