3-phase air conditioning for larger installations

Published:  19 March, 2005

Outdoor unit
Efficient at part load and quiet ó Daikinís 3-phase RZQ Sky Air Super Inverter range.

Daikin has added 3-phase units to its Sky Air Super Inverter range. Three sizes provide cooling from 10 to 14 kW and heating from 11.3 to 16 kW. The RZQ range uses R410A. The proven reluctance DC compressor motor technology delivers high energy efficiency, particularly in the mid to low settings.

The aero-spiral fan reduces air turbulence and pressure loss. A smooth bell-mouth air inlet, with guide vanes at the intake, reduces air turbulence round the blades. Noise levels are 49 to 52 dB(A), which can be reduced by 4 to 5 dB(A) at night.

The control system uses outdoor temperature, occupant and radiated heat to set and maintain room temperature.

The RZQ Super Inverter is supported by a full range of indoor units in 950 and 600 mm square cassette, ceiling ducted, large duct ceiling suspended, ceiling suspended cassette and wall-mounted indoor fan-coil configurations for use as pairs, twin, triple or double-twin combinations.



comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
August 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Show

Jobs

  • Field Sales Executive

    Successful professional technical salesperson required to sell to consultants and contractors. Unique opportunity to sell ultra-low energy, patented technology, ventilation products from a UK manufacturer. ...

  • Property Surveyor

    Property Surveyor/ Building Service Surveyor needed to work within the Technical Services team for the management of water hygiene/ legionella risk within DCC's property portfolio. We are looking for an experienced and dynamic team member to join our T......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar