The rig incorporates two C55 boilers, pressurisation set and expansion vessel. It serves the 3-storey office facility.
Keston won the contract for its ability to tailor products to a customer’s specific needs. This project required a low-height rig as space in the plant room was severely restricted. A solution was sought that could be manoeuvred into position and connected into the system with minimal downtime.
The rig was installed by S&J Industrial pipework of Henley-on-Thames, working closely with Keston throughout the project to ensure the correct specification of boiler plant.
All such rigs are built to order, and Keston guarantees a quick turnaround from order to delivery.
For more information on this story, click here: May, 08 122
Keywords: boiler, Keston