Grundfos worked with Raeburn Drilling & Geotechnical, which provided the heat-exchange system via two boreholes. The control panel of the pumps interfaces with the BMS.
The church was designed by architect James Gibbs and was completed in 1726.
For more information on this story, click here: October08, 87
Keywords: pumps, Grundfos, geothermal





