Lochinvar helps new dementia hospital reach BREEAM ‘Excellent’

Lochinvar, space heating, solar thermal, DHW, renewable energy, domestic hot water
One source of renewable energy for this dementia care home is solar-thermal for a hot-water system supplied by Lochinvar.

Contributing to a BREEAM ‘Excellent’ rating for a new dementia intensive-care unit in Norwich is the provision of domestic hot water by a large solar-thermal system integrated with gas-fired condensing water heaters, all provided by Lochinvar. This £13.7 million facility is at Hammerton Court, part of the Julian Hospital in Norwich of the Norfolk & Suffolk Foundation (NHS) Trust.

The architecture, structure and building services were co-ordinated using a 3D design and draughting software model, which was combined with the services information to avoid clashes. Lochinvar provided detailed design input and supplied 10 solar-thermal collectors, two twin-coil hot-water storage vessels, two EcoShield water heaters and an EcoKnight gas-fired condensing boiler to form a comprehensive heating and hot-water package for the whole facility.

Robert Forster of the trust adds that the system integrates with the ground-source heat pumps, which were installed separately and provide heating as well as a boost for the hot water.

Jacob Sismey, senior mechanical engineer with Ingleton Wood, who provided the building-services design, says that Lochinvar had been recommended to his team by the client and ‘proved to be very helpful and informative on the requirements of the project’.

For more information on this story, click here: July 2013, 129
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.