Chilled-ceiling system has pre-embedded pipes

Published:  05 September, 2013

Rehau, chilled ceiling, air conditioning

Rehau’s CoolBoard chilled-ceiling system is a one-piece system with polymer pipework pre-embedded into plasterboard panels. Pre-drilled fixing holes make it quick and easy to install. Pipe tails from the boards are connected using Rehau Everloc compression sleeve fittings, which guarantee no leaks, and then onto a manifold system for circulating warm or chilled water.

Standard CoolBoards have a cooling capacity of up to 65 W/m2. The high-performance version has graphite particles embedded in the board to achieve a cooling capacity of up to 75 W/m2.

CoolBoards are said to perform exceptionally well with renewable-energy systems.

There are four sizes of board, all finished with a sharp edge on all sides for precise jointing.

For more information on this story, click here: Sept 2013, 174

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
August 2017: DIGITAL EDITION
ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

Construction Week

Show

Jobs

  • Field Sales Executive

    Successful professional technical salesperson required to sell to consultants and contractors. Unique opportunity to sell ultra-low energy, patented technology, ventilation products from a UK manufacturer. ...

  • Property Surveyor

    Property Surveyor/ Building Service Surveyor needed to work within the Technical Services team for the management of water hygiene/ legionella risk within DCC's property portfolio. We are looking for an experienced and dynamic team member to join our T......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar