Atag’s rig for cascade boiler installations

ATAG, Heating, boiler, rig, cascade, space heating

An installation rig for Atag Heating’s Q Series condensing boilers enables up to three boilers to be installed in cascade operation. The rig is only 1.5 m high and enables boilers to be installed in a variety of configurations. Q Series boilers modulate down to 16% of full output and are up to 109.3% efficient. These rigs offer outputs from 9 to 172 kW.

This cascade system comes with a full hydraulic system to suit most installation requirements — including all pipework, isolation and non-return valves, as well as gas line and low-velocity header.

The system can also be used as a separate solution to provide DHW via an indirect hot-water cylinder.

For more information on this story, click here: Oct 2013, 178
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.