Chilled-beam system balances energy demands with simultaneous heating and cooling

Published:  03 September, 2014

Lindab, chilled beam, air conditioning, space heating, Energy Efficiency

The Lindab Solus chilled-beam system conserves energy within a building by using high-temperature cooling (HTC) and low-temperature heating (LTH) in one common pair of water pipes working at a common inlet temperature. This means that regardless of whether the zone needs heating or cooling the inlet temperature remains constant, allowing you to harvest the energy saving benefits this brings.

Depending on the season and the geographic location, there will always be a need for cooling or heating in any given building. In some cases, there will even be a need for simultaneous cooling and heating. In such cases the return water temperature will be higher or lower, respectively, than that of the inlet water, depending on whether a unit is delivering cooling or heating. As the return water from the various parts of the building is mixed together, the temperature will stabilise at a near ideal inlet temperature for the Solus system, eliminating the need for the engagement of both heating and cooling plant.

To ensure that the system performs properly, a constant water volume flow rate is used throughout the entire system. This ensures that all the excess heat energy that may exist in some parts of the building will, in turn, be carried to cooler areas, thereby creating an energy balance in the building. If the water flow is reduced, the energy transfer between the rooms will also be reduced, resulting in a less efficient system. The result of this constant flow rate is the elimination of control valves, actuators or room controllers, providing a huge saving on the installation costs. The higher cooled-water temperature also eliminates the need for pipe insulation and effectively removes condensation risk in the room.

By running a common inlet water temperature of 20 to 23°C (set by the external air temperature) in the water circuit for all areas, regardless of the need for heating or cooling, and mixing the outlet water together, it will only be necessary to either marginally cool or heat the return water to achieve the desired inlet temperature — once again thereby significantly reducing energy consumption.

For more information on this story, click here: September 2014, 109

comments powered by Disqus

Search

Welcome

Welcome to Modern Building Services Online, the web edition of Modern Building Services (MBS) journal and the UK's most popular Building Services engineering site. Modern Building Services covers the entire Building Services Engineering industry. This site contains archived content from the journal, plus web-specific content.

When you go to our digital edition, you can also access the archive of digital editions.
August 2018: DIGITAL EDITION

ARCHIVE OF DIGITAL EDITIONS

Modern Building services has a group
on Linkedin - join us!

BESA conference 2018

Jobs

  • Building Energy Management Systems (BEMS) Engineer

      Consistently rated amongst the world's best universities, Imperial College London is a science-based institution with a reputation for excellence in teaching and research. Imperial has one of the largest and most diverse university estate portfolios in......

  • Engineering Technical Assistant

      Consistently rated amongst the world's best universities, Imperial College London is a science-based institution with a reputation for excellence in teaching and research. Imperial has one of the largest and most diverse university estate portfolios in......

  • Mechanical Engineer

      Coventry University is a dynamic, modern university with a proud tradition as a provider of high quality education and a focus on applied research. The University ranked 13th in the Guardian University Guide 2019 and was voted ‘Modern University of the......

more jobs »

Poll

"Is the Building Services industry lagging behind in the implementation of BIM?"



Calendar