Toshiba air conditioning puts the final touches to restaurant refurbishment

Toshiba
Meeting the heating and cooling needs of the dramatic refurbishment of the Red House on the banks of the River Dee in Chester are two Toshiba systems.
Contributing to the stunning restoration of an architect-designed pub refurbishment on the banks of the River Dee in Chester is air conditioning installed by local contractor Bostock Air Conditioning. The former pub is now a contemporary restaurant with 130 covers. A feature of the refurbishment is the terraced glazed facade. High heat gains and losses through the glazing, which covers both floors of the building and part of the roof, made air conditioning essential. Two Toshiba systems were installed by Bostock. One is a 28 kW VRF SMMS heat-pump system for the main restaurant. The other is a digital inverter twin cassette system for the upstairs bar area and reception. The layout of the dining area lent itself to the neat arrangement of six Toshiba one-way-blow ceiling cassettes in a row near the spine wall of the building below the mezzanine floor. Kevin Bostock says, ‘The installation worked out very well. The outdoor units are sited in a service area near neighbouring residential buildings, but with these new systems, nothing is audible and no disturbance is caused.’
Related links:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.