The school accommodates just over 500 children from pre-nursery age through primary school. It has three floors totalling 2360 m2.
There is a floating screed on each floor, so LK clip rail was installed above the insulation layer to secure the PE-Xa 20 mm pipe at an even depth and predetermined design pattern. Rapid installation was achieved by ‘walking’ the pipe into the clip rail.
To minimise the number of joints, coils of pipe from 75 to 500 m were used, supported by LK manifolds.
For more information on this story, click here: June09, 121
Keywords: Underfloor heating, LK Systems, gournd source heat pump






