Simmtronic supplies lighting controls for Home Office in Sheffield

Simmtronic
Comprehensive lighting control for the Home Office in Sheffield has been supplied by Simmtronic. (Photo. courtesy of NG Bailey).

Simmtronic has supplied SPECS3 fully addressable lighting controls for the fit-out of adjoining buildings J1 and J2 and the link bridge at Riverside Exchange in Sheffield, now occupied by the Home Office.

The buildings are six and seven storeys high, respectively, with a total area of about 18 000 m2.

Open-plan office areas in both buildings have a presence-based lighting-control system with hold functions on notional corridors and stairways. In all small meeting rooms, absence detection control is used, with manual dimming.

The controls in J2 are interfaced with intruder alarms so that floors operate in alarm conditions. In large meeting/training rooms, there is scene setting, absence control and partition interfacing for total flexibility.

Lighting of the link bridge is operated from either side by presence detection.

External lighting around the perimeter, the rooftop garden and feature lights on the underside of the link bridge are operated by a photocell and time clock.

Simmtronic serviced the project from its northern regional office, supplying NG Bailey with a lighting-control system that included Tridonic DSI ballasts and fully addressable LCMs.

For more information on this story, click here: Apr 09, 106
Related links:
Related articles:



modbs tv logo

‘Red tape scrapping is welcome – but more policy changes are needed’

The CEO of heat pump manufacturer Aira UK has said the government’s new proposals to scrap planning red tape for the installation of heat pumps in the UK will be a big breakthrough for the industry and consumers – but more policy changes are needed.

New procurement rules for NHS suppliers

New procurement rules mean NHS suppliers will need to demonstrate their green credentials so the NHS can achieve its target of becoming net zero for directly-controlled emissions by 2040, with an ambition to reach an 80% reduction in its carbon emissions between 2028 to 2032.